All Categories
red lead alkyd antirust paint-0

Alkyd Resin Coating

Home >  Products >  Alkyd Resin Coating

Red Lead Alkyd Antirust Paint

It is made of alkyd resin, new anti-rust pigment, drying agent, additives and solvent.

  • Overview
  • Description
  • Applications
  • Specifications
  • Construction technics
  • Recommended Products
Overview
Place of Origin: Jiangxi
Brand Name: Qianlang
Model Number: C53-31
Certification: ISO900/ISO14001/ISO45001/CE
Minimum Order Quantity: 500kg
Price: USD1.4-1.6
Packaging Details: /
Delivery Time: 30days
Description

Excellent rust prevention

Excellent adhesion

Excellent construction performance

配图.jpg

Applications

Suitable for use as an anti-rust paint on steel structures, steel machinery and equipment, and can be used in conjunction with traditional topcoats such as alkyds.

Specifications
order number Test item Performance index
1 Color and appearance of film Orange red, smooth paint film
2 Viscosity (Coating-4#), s ≥90
3 Fineness,μm ≤60
4 Drying time,(23±2℃) h Surface drying time ≤2
Overall drying time ≤24
5 Adhesion, grade ≤2
6 Impact resistance ,cm ≥40
7 Hardness (double pendulum) ≥0.2
8 Salt-tolerant water (3% NaCl, 96h) No abnormalities
Construction technics

1. Sandblast or shot blast steel to Sa2.5, with a surface roughness of 30-50µm.

2. For substrates with old paint (same type): Remove loose, ineffective old paint and rust, then polish to St3 using pneumatic or electric tools.

3. For welding, flame cutting, or correcting burnt areas: Polish to St3 using pneumatic or electric tools.

4. Application methods include brushing, roller coating, high-pressure airless spraying, and air spraying. Add the paint to an appropriate amount of solvent (our company's supplied solvent) and stir evenly to a viscosity of 40-60µS. Filter through an 80-120 mesh sieve before application.

5. The surface to be painted must be clean and free of oil, dust, rust, etc.

6. Before applying the second coat, the first coat must be completely dry. Leave at least 24 hours between coats, and the total dry film thickness must be at least 80µm.

7. After application, all tools used should be immediately rinsed with solvent to prevent drying.

Attention:

1. When diluting, apply small amounts frequently.

2. The substrate temperature must be 3°C above the dew point, and the relative humidity must not exceed 80%. Do not apply in rainy or snowy conditions.

3. For use with our company's various alkyd topcoats.

4. This product is packaged in 25kg x 1 iron drum.

Storage and transportation:

The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight exposure and rain. If the expiration date is exceeded, it can be tested according to the above technical indicators, if the technical requirements are met, it can still be used.

Safety guarding:

The construction site should have good ventilation facilities, and the painter should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist. Fire and smoke are strictly prohibited at the construction site.

Statement:

The construction data of this product are all accumulated from laboratory tests and practical experience, for reference only. Users can refer to the actual construction conditions for adjustment. We only guarantee the technical quality of this product, and only give guidance on the actual construction situation, we will not be responsible for your construction. We have the right to modify this manual while improving the product.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000