Iron Oxide Red and Iron Oxied Yellow Epoxy Rust-Inhibiting Paint
High solid iron red and iron yellow anti-rust paint composed of epoxy resin, iron red powder, iron yellow powder, fillers, additives and solvents.
- Overview
- Description
- Applications
- Specifications
- Construction technics
- Recommended Products
Overview
| Place of Origin: | Jiangxi |
| Brand Name: | Qianlang |
| Model Number: | H53-2 |
| Certification: | ISO900/ISO14001/ISO45001/CE |
| Minimum Order Quantity: | 500kg |
| Price: | USD2.4-2.6 |
| Packaging Details: | / |
| Delivery Time: | 30days |
Applications
Suitable for anti-corrosion primer of metal components in petroleum, chemical, marine and other industries.
Specifications
| Order number | Test item | Performance index | |
| 1 | Color and appearance of film | Color difference is within the range and paint film is flat | |
| 2 | Viscosity (coating-4#), s | ≥60 | |
| 3 | Drying time (23±2℃), h | Surface drying time | ≤2 |
| Overall drying time | ≤24 | ||
| 4 | Adhesion(grade) | ≤2 | |
| 5 | Impact resistance ,cm | 50 | |
| 6 | Flexibility ,mm | 1 | |
| 7 | Alkaline resistance (0.1mol/L NaOH, 24h) | Does not rust, does not bubble | |
Construction technics
1. Sandblast or shot blast the steel to Sa2.5, with a surface roughness of 30-50µm.
2. Application methods include roller coating or high-pressure airless spraying. Add the paint to an appropriate amount of solvent (use the A/B ratio specified on the certification) and stir thoroughly to achieve a viscosity of 40-60µS. Filter through an 80-120 mesh sieve and allow to mature for 15 minutes before application.
3. The surface to be painted should be clean and free of oil, dust, rust, etc.
4. Before applying the second coat, the first coat should be completely dry. Leave at least 24 hours between coats, with a total dry film thickness of approximately 100-120µm.
5. After application, provide adequate protection during the curing period to prevent damage to the coating caused by rain.
Attention:
1. When diluting, apply in small amounts and multiple times.
2. The substrate temperature must be 3°C above the dew point, and the relative humidity must not exceed 80%. Do not apply in the presence of wind, sand, rain, snow, fog, or temperatures below 5°C. Protect the uncured coating to ensure coating quality.
3. Suitable for use with our company's various epoxy intermediates, epoxy topcoats, asphalt coatings, acrylic polyurethanes, polyurethanes, aliphatic polyurethanes, chlorinated rubber, and other topcoats.
This product is packaged in 25kg iron drums for the main paint and 3kg iron drums for the curing agent.
Storage and transportation:
The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight exposure and rain. If the expiration date is exceeded, it can be tested according to the above technical indicators, if the technical requirements are met, it can still be used.
Safety guarding:
The construction site should have good ventilation facilities, and the painter should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist. Fire and smoke are strictly prohibited at the construction site.
Statement:
The construction data of this product are all accumulated from laboratory tests and practical experience, for reference only. Users can refer to the actual construction conditions for adjustment. We only guarantee the technical quality of this product, and only give guidance on the actual construction situation, we will not be responsible for your construction. We have the right to modify this manual while improving the product.
