Alkyd Micaceous Iron Oxide Intermediate Coating
A room temperature curing coating composed of alkyd resin, mica iron oxide, pigments, fillers, special additives, etc.
- Overview
- Description
- Applications
- Specifications
- Construction technics
- Recommended Products
Overview
| Place of Origin: | Jiangxi |
| Brand Name: | Qianlang |
| Model Number: | C53-38 |
| Certification: | ISO900/ISO14001/ISO45001/CE |
| Minimum Order Quantity: | 500kg |
| Price: | USD1.9-2.1 |
| Packaging Details: | / |
| Delivery Time: | 30days |
Applications
It is suitable for intermediate coating of anti-corrosion coating structure of pipelines and equipment in the fields of petroleum, petrochemical, chemical industry, etc.
Specifications
| Order number | Test item | Performance index | |
| 1 | Color and appearance of film | Gray, smooth paint film | |
| 2 | Viscosity (coating-6#), s | ≥80 | |
| 3 | Drying time ,(23±2℃) h | Surface drying time | ≤4 |
| Overall drying time | ≤24 | ||
| 4 | Flexibility ,mm | 1 | |
| 5 | Adhesion, grade | ≤2 | |
| 6 | Impact resistance ,cm | 50 | |
Construction technics
1. Primer-coated steel surfaces require additional rust removal.
2. Application methods include roller coating or high-pressure airless spraying (conventional spraying is not recommended). Add the paint to an appropriate amount of solvent (our company's solution) and stir thoroughly. Filter through an 80-120 mesh screen.
3. The surface to be painted should be clean and free of oil, dust, rust, etc.
4. The next coat of paint can be applied after the previous one has completely dried. The interval between coats should be 24 hours, and the topcoat should not exceed 30 days. The total dry film thickness should be no less than 90μm.
5. After application, the coating should be cured for 8-10 days. During this curing period, appropriate protection should be provided to prevent damage to the coating caused by rain.
Attention:
1. When diluting, apply small amounts frequently (our company provides a special solvent).
2. The substrate temperature must be 3°C above the dew point, and the relative humidity must not exceed 70%. Do not apply in rainy or snowy conditions.
3. For use with our company's alkyd anti-rust paint, alkyd topcoat, and other paints.
4. This product is packaged in 30kg x 1 iron drum.Storage and transportation:
The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight and rain. If the product exceeds the expiration date, it can be tested according to the above technical indicators. If the technical indicators are met, it can still be used.
Storage and transportation:
The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight exposure and rain. If the expiration date is exceeded, it can be tested according to the above technical indicators, if the technical requirements are met, it can still be used.
Safety guarding:
The construction site should have good ventilation facilities, and the painter should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist. Fire and smoke are strictly prohibited at the construction site.
Statement:
The construction data of this product are all accumulated from laboratory tests and practical experience, for reference only. Users can refer to the actual construction conditions for adjustment. We only guarantee the technical quality of this product, and only give guidance on the actual construction situation, we will not be responsible for your construction. We have the right to modify this manual while improving the product.
