Acrylic Topcoat
It is made by grinding and mixing thermoplastic acrylic resin, various pigments, additives, solvents, etc.
- Overview
- Description
- Applications
- Specifications
- Construction technics
- Recommended Products
Overview
| Place of Origin: | Jiangxi |
| Brand Name: | Qianlang |
| Model Number: | B52-1 |
| Certification: | ISO900/ISO14001/ISO45001/CE |
| Minimum Order Quantity: | 500kg |
| Price: | USD3.3-3.8 |
| Packaging Details: | / |
| Delivery Time: | 30days |
Applications
It is widely used in decorative coating of vehicles, engineering machinery, etc. It can also be used for the parts above the waterline of ships and other offshore facilities steel, bridge facilities, etc.
Specifications
| Order number | Test item | Performance index | |
| 1 | Paint film color and appearance | The paint film is smooth and flat | |
| 2 | Fineness,μm | ≤30 | |
| 3 | Solid content ,% | ≥40 | |
| 4 | drying time(23±2℃)h | Surface drying time(Min) | ≤30 |
| Overall drying time | ≤24 | ||
| 5 | Adhesion, grade | ≤2 | |
| 6 | Impact resistance ,cm | 50 | |
| 7 | Flexibility ,mm | 2 | |
| 8 | Film hardness (pencil) | HB | |
Construction technics
1. Application can be done by brush, roller, high-pressure airless spray, or air-assisted spray. Add the paint to an appropriate amount of solvent (our company's proprietary solvent) and stir thoroughly to achieve a viscosity between 40 and 60 seconds. Filter through an 80-120 mesh sieve and allow to mature for 15 minutes before painting.
2. The surface to be painted should be clean and free of oil, dust, rust, etc.
3. Before applying the second coat, the first coat should be completely dry. A minimum of 24 hours should be allowed between coats, ensuring a total dry film thickness of at least 60 μm.
4. Protect any uncured coating to ensure coating quality.
5. Immediately rinse all equipment with solvent after application to prevent drying.
Attention:
1. When diluting, apply small amounts frequently.
2. The substrate temperature must be 3°C above the dew point, and the relative humidity must not exceed 80%. Do not apply in rainy or snowy conditions.
3. Compatible with our company's various epoxy primers, epoxy micaceous iron intermediates, and chlorinated rubber primers.
4. This product is flammable and explosive, so keep it away from sources of ignition.
5. This product is packaged in 20kg x 1 iron drums.
Storage and transportation:
The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight exposure and rain. If the expiration date is exceeded, it can be tested according to the above technical indicators, if the technical requirements are met, it can still be used.
Safety guarding:
The construction site should have good ventilation facilities, and the painter should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist. Fire and smoke are strictly prohibited at the construction site.
Statement:
The construction data of this product are all accumulated from laboratory tests and practical experience, for reference only. Users can refer to the actual construction conditions for adjustment. We only guarantee the technical quality of this product, and only give guidance on the actual construction situation, we will not be responsible for your construction. We have the right to modify this manual while improving the product.
