All Categories
chlorinated rubber topcoat-0

Chlorinated Rubber Resin Coating

Home >  Products >  Chlorinated Rubber Resin Coating

Chlorinated Rubber Topcoat

It is composed of chlorinated rubber, plasticizer, pigment filler, additive and solvent.

  • Overview
  • Description
  • Applications
  • Specifications
  • Construction technics
  • Recommended Products
Overview
Place of Origin: Jiangxi
Brand Name: Qianlang
Model Number: J52-4
Certification: ISO900/ISO14001/ISO45001/CE
Minimum Order Quantity: 500kg
Price: USD3.9-4.1
Packaging Details: /
Delivery Time: 30days
Description

The paint film has low permeability to water vapor and oxygen, offering excellent water resistance and corrosion resistance.

Dries quickly, several times faster than alkyd paint.

Excellent low-temperature application performance, suitable for application in environments ranging from -20°C to 50°C.

The paint film layers are inter-soluble, resulting in excellent interlayer adhesion. When repainting over an old chlorinated rubber film, there's no need to remove the old, solid film, making repairs easy.

Excellent adhesion.

配图.jpg

Applications

Suitable for use as a protective and decorative finish on various onshore steel structures, including ship waterlines, hulls, and superstructures, as well as power plants, steel mills, dock steel structures, chemical plants, bridges, containers, factory buildings, the exteriors of oil storage tanks, and dry gas tanks.

Specifications
Order number Test item Performance index
1 Color and appearance of film The film is flat and smooth
2 Fineness ,μm ≤40
3 Drying time (23±2℃), h Surface drying time ≤0.5
Overall drying time ≤6
4 Solid content ,% ≥50
5 Adhesion, grade ≤2
6 Flexibility ,mm 2
Construction technics

1. Application can be done by brush, roller, high-pressure airless spray, or air-assisted spray. Add the paint to an appropriate amount of solvent (our company's supplied solvent) and stir thoroughly to achieve a viscosity of 40-60 s. Filter through an 80-120 mesh sieve before applying.

2. The surface should be clean and free of oil, dust, rust, etc.

3. Before applying the second coat, the first coat should be completely dry. A minimum of 6 hours should be allowed between coats, ensuring a dry film thickness of at least 80 μm.

4. Protect any uncured coating to ensure coating quality.

5.After application, rinse all equipment with solvent immediately to prevent drying.

Attention:

1. When diluting, apply small amounts frequently.

2. The substrate temperature must be 3°C above the dew point, and the relative humidity must not exceed 80%. Application should not be made on rainy or snowy days.

3. For use with our company's chlorinated rubber primer, chlorinated rubber intermediate, iron oxide red epoxy rust-resistant primer, and epoxy micaceous iron intermediate.

4. This product is packaged in 23kg x 1 iron drum.

Storage and transportation:

The effective storage period of the product is 12 months, stored in a cool and ventilated place, storage temperature: 5-30℃. During transportation, prevent cold, sunlight exposure and rain. If the expiration date is exceeded, it can be tested according to the above technical indicators, if the technical requirements are met, it can still be used.

Safety guarding:

The construction site should have good ventilation facilities, and the painter should wear glasses, gloves, masks, etc., to avoid skin contact and inhalation of paint mist. Fire and smoke are strictly prohibited at the construction site.

Statement:

The construction data of this product are all accumulated from laboratory tests and practical experience, for reference only. Users can refer to the actual construction conditions for adjustment. We only guarantee the technical quality of this product, and only give guidance on the actual construction situation, we will not be responsible for your construction. We have the right to modify this manual while improving the product.

Get a Free Quote

Our representative will contact you soon.
Email
Name
Company Name
Message
0/1000